The Times 

Volunteers at Work

 

November 17, 2022

Karen Huwe

Karen Huwe (right) Louie and Marie finish the lines at the Preston Avenue bridge. (left) Louie and Allen tape a straight line before repainting at 2nd Street bridge

WAITSBURG­-Louie and Marie Gagnon with a little assistance from friends recently repainted the water level lines at the bridge on Second Street and at the bridge on Preston Avenue. 

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024